Signing the new contract

Today we signed the new contract for our bigger office I was writing about a couple of days ago. We are really excited about this move because we ran out of space in our current office and we plan to stock a lot more products. Signing the contract was quite some torture for me because the landlord is an elderly Chinese man who doesn’t speak a single word English. Additional, he was super slow with reading all the docouments, signing etc. and he had lots of very strange requests. For example, he took a photo of the keys and started to explain to Alan every single key (of course he mixed them up and struggled to identify them). I was so dumbfounded, I had to take a photo. My butt was hurting because I was sitting on a cheap chair for a whole hour already. I was so glad when this whole procedure was over and we finally had the keys. Next week we will move our office. I will definitely take some photos for you guys again.

explanation of each single key

explanation of each single key

now, which one is which one??? hahaha

now, which one is which one??? hahaha

Raining in the Office

OK, here we go again, another problem with the office. While I was working I heard a dripping sound coming from the bathroom. I thought “oh no, not again”. When I checked it out I saw water dripping from the fan and the floor was wet. Great, another leak. I called my husband immediately to tell the landlord about that. A little bit later the door bell rang and the guy from upstairs was in front of my door. He apologized once again and said that he was using some water pressure machine to clean his bathroom. We found out that the water was dripping in from outside and the fan isn’t really water proof. We will need to fix that soon as the raining season will start in June.

The hole is fixed

Our landlord came by this morning to check out the problem in our bathroom. He left and came back with the construction worker and the owner of the office upstairs. Our landlord and the construction worker started discussing and arguing. I didn’t understand a word but it was obvious that he was angry with that guy. The owner of the upper office apologized to me many times (his English was quite good). They then started to fix the hole by pouring concrete into the hole from upstairs and painting white paint over it. That’s it. I hope that;s safe enough and the ceiling won’t come down again.

Hole in the Ceiling
the fixed hole after the concrete was poured in

Handing over delayed

We got a call last night that the landlord cannot finish the renovation until this evening. Therefore we have to postpone the handing over of the keys till Saturday because tomorrow is my husband’s 30th birthday! Damn, I am really not good in being patient especially when I am so looking forward to something. That also means that we have to delay our move from Saturday to Sunday. I hope we can finish everything in one day. There are sooo many things to move. I will need a holiday after this weekend.

And just to make the situation (and my patience) worse we tried to sign up for a business internet connection with Hutchison and they told us they won’t be able to come before 15.4.!!! Are they crazy? How can I work without internet for 2 whole weeks? They are nuts! So my husband kept pushing them and finally they agreed to come on 7.4.08. So that means I have to figure out how to work without internet in the office and use the computer at home instead. My last hope is that I can get some free access to a wireless internet connection from a neighbouring company for that week. ;-) A customer from Australia also made an appointment to see our showroom on the same day so I hope these guys set up my internet before I welcome my first official visitors to our showroom.